The trial
The trial included:
- backfilling and reshaping existing areas that had been eroded
- re-establishing a defined drainage system to ensure the road side runoff ran safely into the existing creek system
- stabilising the drainage system using a number of products and techniques
The 26 trial areas trialled a combination of products and techniques, including reinforced turf, enkamat, geoweb, rock placement and hydromulching. Log placement was utilised on road side verges above culverts.